Equipment details | CM1-22S(E)-N-S-3 BEER KEG WASHER | CM2-22S(E)-N-S-3 BEER KEG WASHER | |||||||
1 | Size:W*L*H | 1.47X1.67X1.50M | 1.54X1.36X1.40M | ||||||
2 | Weight | 180KG | 187KG | ||||||
3 | Packing Size (L*W*H) | 1.32X1.52X1.57M | 1.69×1.51×1.60M | ||||||
4 | Gross Weight) | 327KG | 332KG | ||||||
5 | Capacity | Washing part: | 15-20pcs/h | Washing part: | 30-40pcs/h | ||||
6 | Power | According to user local power (3 Phases 380V 50Hz) | According to user local power (3 Phases 380V 50Hz) | ||||||
7 | Power port | 3P+N+G | 3P+N+G | ||||||
8 | Heater way | Steam Coiler | Electrical Heater | Steam Coiler | Electrical Heater | ||||
9 | Power consumption | 2.0KW | 14KW | 2.0KW | 14KW | ||||
10 | Main Material | SUS304 | SUS304 | ||||||
11 | Water tank material and volume | SUS304 Single tank / Volume=100L (2pcs) | SUS304 Single tank / Volume=100L (2pcs) | ||||||
12 | Motor type and brand | SUS304 Pump Head | SUS304 Pump Head | ||||||
13 | Temperature prode | NTC | NTC | ||||||
14 | Temperature control mode | STC-200 | STC-200 | ||||||
15 | Time setting way | Siemens PLC 200 Smart | Siemens PLC 200 Smart | ||||||
16 | Connect type | 1.5" Tri-clamp | DIN male fitting | 1.5" Tri-clamp | DIN male fitting | ||||
17 | Spear type | A | S | D | G | A | S | D | G |
18 | Keg type | EURO DIN AMERICAN 20L-60Lkeg | EURO DIN AMERICAN 20L-60Lkeg | ||||||
19 | Washing part inlet with pressure detection or not | Yes | No | Yes | No | ||||
20 | Washing part outlet with the residual liquid detection or not | Yes | No | Yes | No | ||||
21 | Washing working procedure | Lock down → clean water washing→ air blowing/drain off → caustic washing → air blowing/to caustic box → hot water 1 washing → air blowing/drain off → hot water 2 washing → CO2 blowing/drain off →CO2 pressure preparing | Lock down → clean water washing→ air blowing/drain off → caustic washing → air blowing/to caustic box → hot water 1 washing → air blowing/drain off → hot water 2 washing → CO2 blowing/drain off →CO2 pressure preparing | ||||||
22 | Package | Composite board boxes | Composite board boxes | ||||||
23 | Lead time | 40-45 days | 40-45 days |
If you have any questions or needs about the product, please fill in the following form and we will contact you as soon as possible.